The power company needed a proven and reliable monitoring solution that could be implemented on time as well as easily integrated into the park’s existing SCADA system and IT structures. AP Sensing was selected because of meeting IEC-61850 standards, DNP3 capabilities, and because of our track record for reliability, flexibility and superior support services.
Power for the new facilities comes from two new circuits: the 12 km Gardenia and the 2 km Barra substations. One AP Sensing Linear Power Series device with 6 channels – 3 for each substation – was installed with a single-ended configuration.
The longer circuit brought its own specific challenges, as it is routed through diverse soil types and travels below a creek in a small concrete tunnel.
The installation was further enhanced with AP Sensing’s RTTR (real time thermal rating) engine and our SmartVision information management suite. The RTTR engine constantly compares current loads with estimates made during planning, to calculate how much the steady-state load can be safely increased. This allows the network to run at the highest possible safe ampacity level.
SmartVision provides a color-coded asset visualization of all circuits in one overview. Temperature graphs and hotspot tables are always available and accessible. SmartVision also offers reporting and analysis capabilities, a central database and alarm management features. The control room is located in a building next to the switching room.
AP Sensing is proud to have been selected for this important infrastructure project. When the Olympic competitions have ended, the Olympic Park will house the first Olympic Training Center (OTC) in Brazil -- the most modern in South America – to support South America’s top athletes. Olympic Park will also include a research laboratory to study nutrition and physical therapy, and will include a sports medicine clinic.